DPW-24227-ISU Install 2nd Cooling Tower Connection
Installing 2nd fluid Cooler on the heat pump loop, new piping, electrical power and controls installation.
Status
Accepting Bids
Prebid Date | 2/20/25 10:00am |
Bid Date | 3/5/25 2:00pm |
Company & Contacts
Idaho Division of Public Works
Barry J. Miller
208-332-1900
Location
Meridian, Idaho
A description of the Work of this project can be summarized to include: Installing a 2nd fluid cooler on the
heat pump loop, new piping, electrical power and controls as required for the installation. This also
includes the installation of a new chemical feed system for the new fluid cooler. A new enclosure will
be built to screen the new fluid cooler.
Estimated Cost: $534,750.00